Risk Management
Wood Street Walls use three key documents for their risk management for their projects.
1. Risk Assessment Template
For every mural, Wood Street Walls carries out a risk assessment.
The Risk Assessment is completed by the designated site manager or site lead, and validated by another member of Wood Street Walls (normally the Project Lead).
The Risk Assessment can be found under the template section.
2. Method Statement
In addition to the Risk Assessment, a Method Statement is completed to fully set out how the mural or installation will be executed.
The Method Statement will be completed prior to the project starting and will be completed by the site lead, and validated by the project lead or another member of Wood Street Walls.
3. Painting Checklist
To ensure all materials, safety and access equipment is ordered ahead of time, Wood Street Walls have created a painting checklist.
This checklist is completed by the site lead, and validated and ordered by the site lead. All materials and equipment ordered/hired is added to the Income Statement sheet.